Planning permission, prepared properly.

Kevin Walsh & Associates prepares and lodges planning applications for homeowners, builders and solicitors. We measure the site, draw the plans, handle the notices and follow the application through to a decision. Based in Swords, working across Dublin.

  • RIAI Architectural Technologist
  • MCIOB
  • Fully insured
  • Since 1998
A newly finished single-storey rear extension with a rooflight and glazed doors on a Dublin house at dawn
Extensions, conversions, new homes

01What we prepare

Applications for the work people actually do.

Most of our planning work relates to residential projects. We also manage retention applications when a property sale reveals works that were carried out without prior approval.

  • 01.1

    House extensions

    Rear, side and two-storey extensions. If yours might be exempt, we'll tell you before you pay for an application.

  • 01.2

    Attic conversions and dormers

    Dormer windows and changes to the roof often need permission, even when the conversion inside doesn't.

  • 01.3

    New homes

    One-off houses and small developments, from the site layout to the full set of drawings.

  • 01.4

    Retention permission

    For work already built without permission. This often comes up when a house goes on the market.

  • 01.5

    Change of use

    When a building, or any part of it, is intended to be used for a different purpose.

  • 01.6

    Exemption opinions and Section 5 declarations

    A signed opinion confirming that your work did not require planning permission, or a Section 5 application to the local authority to formally determine whether the development is exempt from planning.

02How it works

From first visit to final grant.

Allow about three months from the day we start drawing. Here is what happens, and who does what.

  1. Step 1

    Survey and drawings

    We will visit the property, carry out the required surveys, and provide the necessary drawings required by the planning authority.

  2. Step 2

    Public notices

    A notice is placed in a newspaper, and a site notice is erected at the property. The planning application must be lodged within two weeks of the newspaper publication, and we schedule everything carefully to ensure nothing lapses.

  3. Step 3

    Lodged with the council

    We submit the application to the relevant local authority. Members of the public then have an opportunity to make submissions on the proposal.

  4. Step 4

    The decision

    The council normally decides within eight weeks. If it asks for further information, we prepare the response, and the council then has four weeks from receiving it to decide.

  5. Step 5

    Final grant

    After a decision to grant permission, there is a four-week period during which an appeal may be lodged. If no appeals are submitted, the final grant issues and work may begin once the required commencement notice has been lodged. We can monitor the build as it progresses to ensure it remains in line with the permission, making the final certificate of compliance straightforward.

03Exempted development

Do you need planning permission at all?

Some work qualifies as exempted development, meaning it does not require planning permission. The rules for buildings are set out in the Planning and Development Regulations, and every condition must be met. If even one condition is not satisfied, the entire development may be at risk in terms of compliance.

Common Examples of Exempt Development

  • Rear extensions can be constructed up to 40 square metres at ground-floor level, including any previous extensions. At least 25 square metres of private rear garden must remain, and all height and boundary requirements must be met.
  • Front porches: up to 2 square metres, and more than 2 metres from a public road.
  • Attic conversions: work inside the existing roof is usually exempt. Dormer windows change the roof, so they usually need permission.

We will review your plans to ensure they meet the exemption criteria and can provide a signed opinion of exemption for your records. If you require a formal decision from the council, we can submit a Section 5 application on your behalf.

The Building Regulations apply whether or not you need planning permission.

Selling a house with an extension? Certificates of compliance

04Questions

Planning questions, answered.

Something else? Call Kevin on 086 272 1126.

The local authority generally takes about eight weeks to issue a decision to either grant or refuse permission. A final grant or refusal is then issued approximately four weeks after the initial decision.

Not always. Many ground-floor rear extensions up to 40 square metres are exempt, but only if every condition is met. We check before you apply or build.

Permission for work that has already been built. It's often needed when a sale turns up an extension or conversion that never had permission.

A site location map, a site layout plan, floor plans, elevations and sections, at the scales the regulations set, plus the notices and the application form. We prepare all of it.

We go through the council's reasons with you and advise on the best next step, which is usually a revised application or an appeal.

It depends on the project. You get a clear quote after a first chat, and there's no prepayment. The council's application fee is separate and set by law.

05Request a quote

Tell us about the project.

Your request goes straight to Kevin. Prefer to talk? Call 086 272 1126.

Call086 272 1126 Emailkwa819@gmail.com

Based in Swords, Co. Dublin. Planning applications across Fingal, Dublin and beyond.